empty

install the city induction led display screen

Shenzhen sensational hot sun, outdoor temperature over 40 degrees to install the city induction led display

screen

QQ图片20190826192745

Today,On August 24th, we installed the p16 two-color induction led display screen on Yanlong Avenue in Shenzhen.

This two-color screen is quite large, with a width of 6.1 meters and a height of 4.2 meters. It has a total of 15 boxes.

Re-listing the title, Shenzhen Yanlong Avenue, the outdoor temperature is over 40 degrees, install the city induction

screen.

The summer vacation is almost over, it is September 1st. It is still very hot at this time. And During this time we just

installed this p16 city induction screen in Yanlong Avenue in Shenzhen, also called P16 two-color display.

The display we installed this time is particularly large. It is composed of 15 boxes. The bottom is three horizontal boxes.

It is then stacked one layer at a time. There are 5 layers in total, and the cabinet has a total of 15 stitches. stand up
This time, the position of the display screen is very obvious. It is mainly located in the direction of Yanlong Avenue to

Shenzhen Shuiguan Expressway. It mainly reminds Yanlong Avenue and the official traffic screen of the water traffic

and the traffic conditions.
We installed it on the spot, it was really hot. It can be said that an egg can be placed there, it can be cooked, we are

all soaked, and the water of the stone can be ticking away. I feel dizzy when I am not so hot, it seems to have the

feeling of heatstroke

QQ图片20190826192745

Well, this time the display is installed from 9:00 in the morning to 6:00 in the afternoon, because this time the number

of flats is a little more, we stack them one by one, and then connect one layer and one layer. Power line signal line,

then connect it, ready to stand up this display, hang it up and then power it up, then test this effect

Do you know how the city induced screen is controlled? Or in our technical terms, is it controlled synchronously or

asynchronously? It’s really hard to imagine that we have done a lot of such cities and it has been flattened. All the

city-induced screens are basically controlled asynchronously, but this led display is synchronized according to the

customer’s requirements to control the cards we use. These things are all displayed by the synchronous controller.
This time,and the control mode of this city’s induced screen in Longgang District, Shenzhen is mainly controlled by

computer in real time. The main control method is through the urban brain section, the fiber is pulled to the position

of the display screen, and there is an optical transceiver at the position of the display screen. There is a synchronous

controller, and then the optical fiber signal of the optical transceiver is converted into a signal of 232, and then the

signal of 232 is directly converted into the control card of the display screen, which can be synchronously implemented

and synchronized.

QQ图片20190826192740

What are the benefits of synchronous control of urban induced screens? If the city guidance screen is controlled by a

synchronous controller, he can immediately implement the transmission of this signal at any time in special circumstances,

such as traffic jams in front or front accidents, or any special situation in front can be implemented immediately, and can

be played. Some of the current markup languages, such as black and evil, and its display mode is more advanced than

asynchronous, it can play animated images in real time.
The asynchronous control card, in this respect, is weaker than the synchronous control card, especially in the part of the

display signal, then the synchronous control card can display the image text animation effect, but the asynchronous but

needs to be edited, and then resend Then his maintenance is also more troublesome, so each has its own advantages,

the way the asynchronous control card is controlled is relatively stable, but the synchronous control card is more user-friendly.

After being in a hot summer day, the outdoor temperature exceeded 40 degrees, and the city induced screen was installed.

Although we added color to the city, this time the heat also made me unforgettable. The whole body was soaked because it

was true. It’s too hot, and it’s very dangerous, because the traffic in the surrounding area is particularly large. He is the main

road of the city, and the traffic speed is also very fast, so it’s hard to forget my bell. This is also the imprint of a city. It is also

a mark in the middle of my mind. Do everything in detail and do every detail in advance to be able to make the product

I am very grateful to this time that our fellow employees have been installed from 9:00 am to 6 pm. We have been working

together on the spot, and we have been working closely together to handle this matter, from installing the led display box to

installing the display signal line. Then, install the power line of the city induction screen, and then process the part of the optical

transceiver through the power line signal line. All of them are connected step by step, step by step, it is really everyone wearing

a straw hat, paying Work hard, work hard, thank my colleagues for their efforts

8

If you are interested in our product,Please fell free to contact with us

Email address :fiona@wdm88led.com
Skype: fionahuang0812
Wechat /Whatsapp: 008613652406263
QQ:3119891619
Wechat

Post time: Aug-24-2019
INQUIRY NOW
  • * CAPTCHA: Please select the Tree