empty

Automatic Railway Gate Control -mini project



the objective :

provide an automatic railway gate at a Level crossing replacing the gates operated by the gatekeeper TO :

Reduction of time for which the gate is being kept closed.
To provide safety to the road users by reducing the accidents.
Higher reliability as it is not subjected to manual errors.


Post time: Jun-18-2017
INQUIRY NOW
  • * CAPTCHA: Please select the Tree