The system for subsurface-, time- and costeffective anchor installation for
- track field lighting masts,
- overhead power masts,
- traffic lights and other types of lighting,
- all types of railway signals as well as
- various special purposes.
Certified by EBA und Deutsche Bahn AG, approx. 4000 units are installed to date.
Benefits of the Ground Pier Adapter during installation and assembly:
- Low impact on tracks and earthworks — no damage to ground layer structures (PSS, FSS, gravel, etc.), because no shoring work is required. No additional work is necessary (e.g. no tamping work to restore rails).
- The time required to install the piling tube and mount the ground pier adapter at the place of installation is approx. 1 hour, including assembly. This provides cost-cutting potentials for safeguarding and supervision during construction.
- Optionally, short shutdown periods can be used to just to pile the tubes and then assemble the ground pier adapters by hand during normal rail operation, meaning that even short shutdown periods can be used optimally.
- Immediate availability of the signal devices, synergy effects are possible — e.g. when errecting masts
- Certified structural stability for all rail classes to a speed of 186 mph (300 km/h)
- Since no shoring work is required, there is no need for disposal of excavated and possibly contaminated material.
Please contact us for further informations:
BBL Bahnbau Lüneburg GmbH
Zeppelinstraße 30
21337 Lüneburg
Germany
Fon: 0049 / 4131 / 95006-0
Fax: 0049 / 95 00 6-99
Mail: info@bbl-gmbh.de
www.bbl-gmbh.de
Post time: Dec-14-2016