Kochi Metro Rail 2017 | First Drive Palarivattom to Aluva



കൊച്ചി മെട്രോ ട്രെയിന്‍ കാണാം#MyMetro #KochiMetro Kochi Metro is an under-construction metro system for the city of Kochi in Kerala, India and is the fastest metro project in India. The first phase is being set up at an estimated cost of ₹51.81 billion (US$800 million) A 13.4 km (8.3 mi) section of the line from Aluva to Palarivattom will open in June 2017.A second 5 km (3.1 mi) section from Palarivattom up to Maharaja’s College will be made operational by August 2017
Estimated Completion Cost: Rs 5181.79 Cr
Fare: Rs 15/- to Rs 30/-
Fare Collection: Automatic fare collection system with combination of smart card & computerized paper tickets
Capacity/Train: 975 passengers (8 Standee passengers/sq.mtr,seating 140)
Stations
1. Aluva
2. Pulinchodu
3. Companypady
4. Ambattukavu
5. Muttom
6. Kalamassery
7. Cochin University
8. Pathadipalam
9. Edapally
10. Changampuzha Park
11. Palarivattom
Technical Features
Construction Methodology: Elevated viaduct carried over pre-stressed concrete ‘U/I’ shaped girders with pile / open foundations
Rolling Stock: 2.9 m wide modern rolling stock with stainless steel body, standard gauge axle load of 15 tonnes
Voltage: 750 V DC
Power Supply Source: 110Kv AC
Power Collection: Third Rail Bottom Collection
System: Light Metro System
Type of Signalling: Communication Based Train Control (CBTC) with ATO & ATP
Telecommunication: Integrated system with Fibre Optic cables, SCADA, Train radio, PA system etc
Contracts and Tenders awarded:
Viaduct and Station Buildings
Viaduct and 6 Station Buildings from Aluva to Kalamassery – Larson & Toubro, Chennai
Viaduct and 6 Station Buildings from Kalamassery to JLN Stadium – Larson & Toubro, Chennai
Viaduct and 5 Station Buildings from JLN Stadium to Ernakulam Junction Station – Soma Enterprises Limited, Pune.
Viaduct and 5 Station Buildings from Ernakulam Junction to Petta – Era & Ranken (JV), New Delhi.
Modification to EHT Lines of KSEB
Vindhya Telelinks Ltd, New Delhi – KE-1 to KE- 7
Red Star Constructions, Alappuzha – KE-8 (Muttom)


Post time: Jun-14-2017