Prototype model of advanced train control system. It automatically stop at specified stations and start after a fined time. there are fustian like road crossing gate control on any coming train.stop the train if any object found in front it or if found any track break the train automatically stop if it detecting fire in train along with warning alarm and train is stop. the control room and train communicates each other wireless by RF and train stats us update at control room automatically. there are a traffic light for crossing gate
Post time: Apr-09-2017