The hardware part for this project is a model of four way junction of a traffic light. Control program is developed for a main street (S/N) with 4 intersections (4 E/W streets) to control their traffic lights. On locations where each secondary East- west road intersects the main one, I have two traffic light boxes each with 3 light indicators and 1× 2 digits countdown meter. Thus the purpose of the project is to control all these timers and traffic lights all in harmony. countdown meters are to remind drivers and pedestrians of the waiting time through counting down numbers to effectively reduce the rate of traffic accidents.
Post time: Jun-18-2017